Construction of Boeing's New 787 Plant in Charleston, SC
- Jul 20, 2010
- 0 Comments
Among other Equipment and Supplies, Hanes Supply has provided all of the major Rigging and Sling Equipment necessary for the ironworkers completion of the plant's construction, as well as Power and Hand Tools, Safety Equipment and many additional Construction Supplies. Hanes Supply will continue to meet the future needs of the contractors on the Boeing 787 Plant.
Channellock® 426 Tongue and Groove Plier, 7/8 in Nominal, 3/4 in L C1080 High Carbon Steel Straight Jaw, 6-1/2 in OAL
Stanley® 33-716 FatMax® Reinforced Tape Rule with BladeArmor®, 16 ft L x 1-1/4 in W Blade, Mylar® Polyester Film Blade
Arrowâ„¢ HT50 Professional Heavy Duty Tomahawk Hammer Tacker, Flat Crown Staple
Estwing® E324S Framing Hammer, 16 in OAL, Smooth Surface, 24 oz Steel Head, Straight Claw, Steel Handle
Klein® D2000-9ST 2000 Heavy Duty Rebar Work Cutting Plier, 9-3/8 in OAL
BBI® 777037 All Threaded Rod, 3/8-16, 12 ft OAL, Steel Alloy
BBI® 754072 Medium Split Lock Washer, 1/2 in Nominal, 18-8 SS
DeWALT® Power-Stud®+ Powers® 7449SD1-PWR Expansion Wedge Anchor, 3/4 in dia, 10 in OAL, 7-1/2 in L Thread, Carbon Steel, Zinc Plated
Primesource® 8CTDSKR Sinker Nail, 17/64 in, 2-3/8 in L, 9 ga, Vinyl Coated, Smooth Shank
Campbell® T3899724 Hitch Pin, 1/2 in dia, 4-1/4 in L Usable, Forged Steel, Zinc Plated with Yellow Chromate, 5 Grade