Tagged with 'Sling Saver shackles'

Lifting the Maid of the Mist

Two Maid of The Mist boats on a crane
The Niagara Falls attraction the Maid of the Mist was welcomed to its new home on Thursday, October 31st 2013. The two tour boats, weighing approximately 125 tons each, needed to be lifted onto the new concrete slab that was built on the American side of the Niagara River for storage during the winter months.

Read more

Working with IMCO's MG-Krete™ Concrete Solution

Men on jobsite mixing MG-Krete
Hanes Supply is a major distributor of IMCO's MG-KRETE™ Concrete Patching line. We are very pleased to carry MG-KRETE Concrete Repair Compounds. IMCO's MG-KRETE is considered the perfect patch that bonds tenaciously to concrete, is simple to use, has a quick set time and is considerably economical.

Read more